Analisa Prediksi Produksi Energi PLTA Menggunakan Metode Simulasi Monte Carlo


  • Sinda Ramadhana Akbar * Mail Institut Teknologi PLN, DKI Jakarta, Indonesia
  • Musa Partahi Marbun Institut Teknologi PLN, DKI Jakarta, Indonesia
  • (*) Corresponding Author
Keywords: Hydropower Plant; Monte Carlo Simulation; Energy Production Forecasting; Capacity Factor; Take-or-Pay; Kerinci Merangin Hydropower Plant

Abstract

Hydropower Plants (HPPs) are one of the most important renewable energy sources supporting the national electricity supply. However, electricity generation in HPPs is influenced by various factors, including hydrological conditions, water discharge, rainfall, equipment reliability, maintenance schedules, and power system demand, resulting in inherent uncertainty in energy production. This study aims to predict the electricity generation of the Kerinci Merangin Hydropower Plant over a 30-year period using the Monte Carlo Simulation method and to analyze its Capacity Factor (CF). A quantitative approach was employed using historical electricity generation data from the Kerinci Merangin Hydropower Plant. The research procedure included probability distribution analysis, cumulative distribution development, random number generation using Microsoft Excel, and 360 simulation iterations representing 30 years of plant operation. The simulation results indicate a total projected electricity generation of 42,950,284,934 kWh, with an average annual generation of 1,431,676,164 kWh and an average monthly generation of 119,306,347 kWh. The average Capacity Factor was 46.68%, with monthly values ranging from 14.91% to 92.22%, indicating a moderate to high level of plant capacity utilization. Evaluation under the annual Take-or-Pay scheme shows that most simulation results meet the contractual energy target, although seven years are predicted to fall below the target due to variations in hydrological conditions, water discharge, and plant operational reliability. The findings demonstrate that the Monte Carlo Simulation method is effective for long-term electricity generation forecasting and can serve as a valuable tool for operational planning, maintenance scheduling, water resource management, and business strategy development to enhance system reliability and support informed decision-making.

Downloads

Download data is not yet available.

References

Abilio Faizal, R., Author, S., & Nurpulaela, L. (2025). Analisis Efisiensi Teknis Dan Ekonomis Pembangkit Listrik Tenaga Mikrohidro Menggunakan Homer (Studi Kasus Pltmh Pakem). Jurnal Informatika Dan Teknik Elektro Terapan, 13(3s1). Https://Doi.Org/10.23960/Jitet.V13i3s1.7869

Agustian, F. A. P., & Helmizar. (2023). Analisis Potensi Daya Pada Pembangkit Unit 7 Plta Tes. Teknosia, 17(1), 47–55. Https://Doi.Org/10.33369/Teknosia.V17i1.26702

Altamis, A. E., Rasyid, P. A., Arifin, A. N., & Widayoko, A. (2026). Analisis Potensi Energi Biomassa Dari Limbah Sekam Padi Menggunakan Model Stokastik (Monte-Carlo) Untuk Mendukung Ketahanan Energi Dalam Upaya Rpjpn Indonesia. Jurnal Integrasi Sains Dan Qur’an (Jisqu), 5(01), 540–550. Https://Doi.Org/10.64477/501540-550

Asriningati, A., & Suryanto, A. (2022). Desain Pemanfaatan Sistem Pembangkit Hybrid Diesel Generator-Pv Interaktif Grid. Jurnal Teknik Elektro Uniba (Jte Uniba), 6(2), 241–246. Https://Doi.Org/10.36277/Jteuniba.V6i2.160

Bolhuis, P. G., & Swenson, D. W. H. (2021). Transition Path Sampling As Markov Chain Monte Carlo Of Trajectories: Recent Algorithms, Software, Applications, And Future Outlook. Advanced Theory And Simulations, 4(4). Https://Doi.Org/10.1002/Adts.202000237

Ernest Putra, W., Sukerayasa, I. W., & Dwi Giriantari, I. A. (2023). Studi Potensi Pembangkit Listrik Tenaga Mikro Hidro (Pltmh) Di Sungai Yeh Dikis Banjar Lebah Kabupaten Tabanan. Jurnal Spektrum, 10(2), 14. Https://Doi.Org/10.24843/Spektrum.2023.V10.I02.P3

Fang, R., Luo, C., Pan, Z., Li, J., Xu, F., Zheng, J., Mao, X., Wang, X., Li, R., Wei, Y., Chen, Y., & Vorobyev, A. Y. (2024). Efficient Harvesting Of Renewable Evaporative Energy From Atmospheric Air Through Hierarchical Nano/Microscale Shaping Of Air-Water Interface. Applied Energy, 358, 122655. Https://Doi.Org/10.1016/J.Apenergy.2024.122655

Fitri, F., Risdhayanti, A. D., Permatasari, D. A., & Riatma, G. P. (2023). Pengaruh Sudut Propeller Jenis Pelton Terhadap Performa Pembangkit Listrik Nano Hidro Portabel Dalam Kegiatan Luar Ruangan. Jurnal Elektronika Dan Otomasi Industri, 10(2), 164–174. Https://Doi.Org/10.33795/Elkolind.V10i2.3061

Larasari, A., Sitorus, J., Wiratama Asad, Moh. B., & Firmana, A. (2021). Tinjauan Potensi Teknis Dan Kelayakan Ekonomi Plta Pada Proyek Kerja Sama Pemerintah Dengan Badan Usaha Bendungan Merangin. Jurnal Sumber Daya Air, 17(2), 95–110. Https://Doi.Org/10.32679/Jsda.V17i2.724

Lindawati, L., Sari, E. K., & Ermawati, Y. (2021). Potensi Energi Pembangkit Listrik Tenaga Mikro Hidro (Pltmh) Niagara Desa Rantau Nipis Kecamatan Banding Agung Kabupaten Ogan Komering Ulu Selatan. Jurnal Deformasi, 6(2), 70–79. Https://Doi.Org/10.31851/Deformasi.V6i2.6472

Malik, M. I., Adriansyah, A., & Shamsudin, A. U. (2023). Techno-Economic Analysis Utilization Of On-Grid Solar Photovoltaic Systems In Improving Energy Efficiency In Manufacturing Industries. Journal Of Integrated And Advanced Engineering (Jiae), 3(2), 101–110. Https://Doi.Org/10.51662/Jiae.V3i2.96

Malik, M. I., & Ihsanto, E. (2023). Design And Simulation High Pass Filter Second Order And C-Type Filter For Reducing Harmonics As Power Quality Repair Effort In The Automotive Industry. Journal Of Integrated And Advanced Engineering (Jiae), 3(1), 23–36. Https://Doi.Org/10.51662/Jiae.V3i1.79

Malik, M. I., Widyantoro, W., Rabbika, A. I., Yanti, Y., & Yadi, Y. (2024). Analisis Potensi Pembangkitan Listrik Tenaga Nano Hydro Di Saluran Irigasi Desa Cintaraja Tasikmalaya. Jurnal Teknik Elektro Uniba (Jte Uniba), 9(1), 540–547. Https://Doi.Org/10.36277/Jteuniba.V9i1.393

Murni, S. S., & Suryanto, A. (2021). Analisis Efisiensi Daya Pembangkit Listrik Tenaga Mikrohidro Menggunakan Homer (Studi Kasus Pltmh Parakandowo Kabupaten Pekalongan). Jurnal Listrik, Instrumentasi Dan Elektronika Terapan (Juliet), 1(2). Https://Doi.Org/10.22146/Juliet.V1i2.61282

Nadhiroh, N. (2020a). Analisis Pemberitaan Potensi Angin Di Media Online Untuk Merealisasikan Pembangkit Listrik Tenaga Bayu Di Kabupaten Wonogiri. Lisyabab : Jurnal Studi Islam Dan Sosial, 1(2), 291–302. Https://Doi.Org/10.58326/Jurnallisyabab.V1i2.56

Nadhiroh, N. (2020b). Analisis Pemberitaan Potensi Angin Di Media Online Untuk Merealisasikan Pembangkit Listrik Tenaga Bayu Di Kabupaten Wonogiri. Lisyabab : Jurnal Studi Islam Dan Sosial, 1(2), 291–302. Https://Doi.Org/10.58326/Jurnallisyabab.V1i2.56

Palintin, A., Patandianan, E., & Bawan, E. (2020). Potensi Pembangkit Listrik Tenaga Mikrohidro (Pltmh) Di Kabupaten Pegunungan Arfak. Igya Ser Hanjop: Jurnal Pembangunan Berkelanjutan, 2(1), 11–24. Https://Doi.Org/10.47039/Ish.2.2020.11-24

Rahayu, L. N., & Windarta, J. (2022). Tinjauan Potensi Dan Kebijakan Pengembangan Plta Dan Pltmh Di Indonesia. Jurnal Energi Baru Dan Terbarukan, 3(2), 88–98. Https://Doi.Org/10.14710/Jebt.2022.13327

Rosiani, D., Indayani, R., Cycilia Rymoza, V., & Setyo Rahayu, T. (2024). Estimasi Potensi Cadangan Energi Panas Bumi Lapangan Z Menggunakan Simulasi Stochastic Monte Carlo. Prosiding Seminar Nasional Teknologi Energi Dan Mineral, 4(1), 931–937. Https://Doi.Org/10.53026/Prosidingsntem.V4i1.357

Sofyan, Moh., & Sudana, I. M. (2022). Analisis Potensi Pembangkit Listrik Tenaga Mikro Hidro (Pltmh) Berdasarkan Debit Air Dan Kebutuhan Energi Listrik. Jurnal Listrik, Instrumentasi, Dan Elektronika Terapan, 3(2). Https://Doi.Org/10.22146/Juliet.V3i2.64410

Su, H., Nilghaz, A., Liu, D., Dai, L., Tian, J., Razal, J. M., Tang, K., & Li, J. (2023). Harnessing The Power Of Water: A Review Of Hydroelectric Nanogenerators. Nano Energy, 116, 108819. Https://Doi.Org/10.1016/J.Nanoen.2023.108819

Tama, M. Z. V., & Subekti, H. (2025). Simulasi Monte Carlo Berbasis Python Untuk Estimasi Sumber Daya Panas Bumi Dengan Metode Volumetrik Di Lapangan Z. Prosiding Seminar Nasional Teknologi Energi Dan Mineral, 5(1), 1505–1515. Https://Doi.Org/10.53026/Prosidingsntem.V5i1.734

Utiarahman, D. F., Labdul, B. Y., & Alitu, A. (2024). Studi Potensi Pembangkit Listrik Tenaga Air (Plta) Pada Bendungan Bulango Ulu Kabupaten Bone Bolango. Jurnal Teknik Sumber Daya Air. Https://Doi.Org/10.56860/Jtsda.V4i1.58

Yana, S., Ibrahim, N., Afrizal Zubir, A., Zulfikar, T., & Yulisma, A. (2022). Dampak Ekspansi Biomassa Sebagai Energi Terbarukan: Kasus Energi Terbarukan Indonesia. Jurnal Serambi Engineering, Vii(4), 4036–4050. Https://Www.Bps.Go.Id/Indicator/7/1808/1/Intensitas-

Zaini, M., Safrudin, S., & Bachrudin, Moh. (2020). Perancangan Sistem Monitoring Tegangan, Arus Dan Frekuensi Pada Pembangkit Listrik Tenaga Mikrohidro Berbasis Iot. Tesla: Jurnal Teknik Elektro, 22(2), 139. Https://Doi.Org/10.24912/Tesla.V0i0.9081


Bila bermanfaat silahkan share artikel ini

Berikan Komentar Anda terhadap artikel Analisa Prediksi Produksi Energi PLTA Menggunakan Metode Simulasi Monte Carlo

Dimensions Badge
Article History
Published: 2026-09-30
Abstract View: 0 times
PDF Download: 0 times
Section
Articles