Pemanfaatan Teknologi Pembangkit Listrik Tenaga Pikohidro di Desa Pesucen Kabupaten Banyuwangi


  • Khairul Muzaka * Mail Politeknik Negeri Banyuwangi, Banyuwangi, Indonesia
  • Galang Sandy Prayogo Politeknik Negeri Banyuwangi, Banyuwangi, Indonesia
  • Dian Ridlo Pamuji Politeknik Negeri Banyuwangi, Banyuwangi, Indonesia
  • (*) Corresponding Author
Keywords: Pico Hydro; Power Plant; Alternative Energy

Abstract

The use of alternative energy is being promoted to replace the dependence on fossil energy such as coal. Coal is mostly used as fuel in power plants. The proven reserves of coal are 31.35 billion tons, if it is assumed that there are no discoveries of new reserves, the coal will last in 72 years. Therefore, the government through the National Energy Policy No. 79 of 2014 mandates the use of renewable energy at least 23% in 2025 and 31% in 2050. One of the energy sources that is often used as a substitute for fossil energy is water. The energy possessed by water can be used as electricity generation of Hydro Power Plant. Many villages in Indonesia have rivers and irrigation channels that have not been utilized as a new and renewable energy source, especially for micro and pico-scale power plants. One of the irrigations flows that have not been utilized is in the village of Pesucen, Banyuwangi Regency, East Java. The flow of the irrigation canal has a fairly heavy flow so it is suitable for a Pico Hydro Power Plant. The Pico Hydro Power Plant which will be made is expected to provide an alternative to generating electricity by utilizing existing irrigation channels which is located behind houses. In addition, the Pico Hydro Power Plant can reduce the dependence of residents on existing electricity sources and irrigation channels have more value than before

Downloads

Download data is not yet available.

References

Batan, I Made Londen (2012), Desain Produk. Edisi Pertama. Guna Widya, Surabaya.

BPPT (2015), Outlook Energy Indonesia. Pusat Teknologi Pengembangan Sumber Daya dan Energi

Budynas, G Richard (1999), Advanced Strength and Applied StressAnalysis. Second Edition. Mc.Graw-Hill.

Ibrahim, A, M dan Yoshihihide Suwa (2018), Effect of Blade Inclination Angle on the Efficiency of Hydrokinetic Turbine in an Undershoot Zero Head System, International Journal of Materials, Mechanics and Manufacturing. Vol. 6, pp. 388 -391.

Ichsan Rasyid (2019), Irigasi Untuk Pembangkit Listrik Tenaga Piko, Radar Banyuwangi, Tersedia 12 Desember 2019, 13:56:51 wib https://radarbanyuwangi.jawapos.com/read/2019/12/12/169918/irigasi-untuk-pembangkit-listrik-tenaga-piko

J.D., Moesley, P., dan Gill, A (2000), Recommendations on the Use of Microhydro Power in Rural Development. Journal of International Development, Vol.12, pp. 975-983.

Muller, G. (2014), Water Wheels as a Power Source. Renewable Energy, Tersedia 2 Desember 2019, 10:46:23 wib http://hmf.enseeiht.fr/travaux /CD0708/beiere/3/html/bi/3/ fichiers/Muller_histo.pdf

Purwantono, Bahrul Amin, Abdul Aziz, Jasman, dan Andre Kurniawan (2019), Performance Test of Pikohidro Cross Flow Water Turbine Using Multilevel Double Penstock, Teknomekanik, Vol.2, pp 76 – 80.

Sato, G.T dan Hartanto N.S (2000), Menggambar Mesin Menurut Standart ISO, Pradnya Paramita, Jakarta.

Sularso(1997), Dasar – dasar Perencanaan dan Pemeliharaan Elemen Mesin. Pradnya Paramita, Jakarta.

Verlag, Westermann Georg (1966), Westerman Tables. Wiley Eastern Limited. Fulford


Bila bermanfaat silahkan share artikel ini

Berikan Komentar Anda terhadap artikel Pemanfaatan Teknologi Pembangkit Listrik Tenaga Pikohidro di Desa Pesucen Kabupaten Banyuwangi

Dimensions Badge
Article History
Published: 2021-03-30
Abstract View: 0 times
PDF Download: 0 times
How to Cite
Muzaka, K., Prayogo, G., & Pamuji, D. (2021). Pemanfaatan Teknologi Pembangkit Listrik Tenaga Pikohidro di Desa Pesucen Kabupaten Banyuwangi. Journal of Social Responsibility Projects by Higher Education Forum, 1(3), 65-69. Retrieved from https://ejurnal.seminar-id.com/index.php/jrespro/article/view/677
Section
Articles