Aplikasi Optimalisasi Penjadwalan Proyek dengan Metode Harmony Search (Studi Kasus: AKSDAI)


  • Yusida Widana STMIK Budi Darma
Keywords: Operations Research Techniques, Project Scheduling, Harmony Search

Abstract

Scheduling is one of the important stages in the industrial world, especially in terms of building a building. Usually in handling a development project, resources are available in a limited amount of resources. The purpose of project scheduling is to optimize project scheduling with the Harmony Search method. Harmony Search method is a method that adopts the process of finding a blend of tones in order to obtain beautiful musical harmony. Similarly, the optimization process that looks for optimal or perfect solutions based on functions and objectives. Harmony Search (HS) was first introduced by Zong Woo Geem in 2001. The basic idea of ​​Harmony Search is to mimic the process of improving the harmony of music undertaken by music choir groups. When a music choir makes improvements to the harmony of the music being played, there will be three possible choices, including playing well-known harmony music based on their memories, playing harmony music that is similar to well-known harmony music but there is little adjustment, or making harmony music that is new.

Downloads

Download data is not yet available.

References

Risky Imansyah dan Purwanto, “Penerapan Algoritma Harmony Search pada Resource-Constrained Project Scheduling Problem ( RCPSP ),”, pp. 1–12.

A. R. riswaya Hasan Abdurahman, “Aplikasi Pinjaman Pembayaran Secara Kredit Pada Bank Yudha Bhakti,”, vol. 8, no. 2, pp. 61–69, 2014.

K. Com, D. I. Samarinda, and M. Aidi, “ANALISIS OPTIMALISASI PELAYANAN KONSUMEN BERDASARKAN TEORI ANTRIAN PADA,” vol. 2, no. 3, pp. 346–357, 2014.

L. A. Kalangi, R. J. M. Mandagi, and D. R. O. Walangitan, “PENERAPAN PRECEDENCE DIAGRAM METHOD DALAM KONSTRUKSI BANGUNAN ( Studi Kasus : Gedung GMIM Syaloom di Karombasan ),” vol. 3, no. 1, pp. 49–57, 2015.[5] K. Endro Prihastono, “Penjadwalan Produksi Bordir Kain Di CV Djarum Mulia Embroidery,”, pp. 8–18, 2015.

novi yusliani tristi dwi riski, “rancang bangun sistem pengecekan ambiguitas kalimat berbahasa indonesia menggunakan harmony search algorithm,” vol. 2, no. 1, pp. 979-587-626–0, 2016.

M. S. Rosa A.S, Rekayasa Perangkat Lunak. Bandung: informatika bandung, 2016.

Woro Widya, Membuat Aplikasi Client Server dengan Visual Basic 2008. Yogyakarta: cv.Andi offset, 2010.

Ayu wulandari indra kanedi, jauhari, “tata kelola perpustakaan menggunakan bahasa pemograman visual basic 6.0,” vol. 9, no. 1, 2013.


Bila bermanfaat silahkan share artikel ini

Berikan Komentar Anda terhadap artikel Aplikasi Optimalisasi Penjadwalan Proyek dengan Metode Harmony Search (Studi Kasus: AKSDAI)

Published
2020-05-24