Penilaian Risiko dan Alokasi Modal pada Investasi Proyek Tambang di Bawah Ketidakpastian: Peran Simulasi Monte Carlo
Abstract
Mining project valuation rests on many interacting uncertain variables, from commodity prices, exchange rates, capital and operating costs, ore grade and recovery, to fiscal terms and the discount rate. Deterministic discounted cash flow analysis is useful as a baseline but offers little information about the probability and severity of loss, which weakens it as a basis for capital allocation decisions. This review positions Monte Carlo simulation as a probabilistic investment appraisal method. The research method is a systematic literature review guided by PRISMA 2020, combining two-stage screening with thematic synthesis of eligible studies. Three search sources were used, namely Publish or Perish, ScienceDirect, and ResearchRabbit, with all records managed in Rayyan. From 6,834 initial records, a two-stage title, abstract, keyword, and metadata screening process followed by full-text verification of potentially eligible studies retained 67 studies, comprising 52 direct mining valuation studies and 15 methodological support studies. The synthesis shows that Monte Carlo simulation moves the basis of decision from a single point value to a distribution of project value together with downside risk metrics such as probability of loss, value-at-risk, and conditional value-at-risk. The review delivers a taxonomy of eight valuation method families mapped to investment decision contexts, a mapping of risk drivers to decision metrics, and a critique of simplified dependency assumptions that may make downside risk estimates too optimistic.
Downloads
References
Ahmadi, R., & Bratvold, R. B. (2023). An exposition of least square Monte Carlo approach for real options valuation. Journal of Petroleum Science and Engineering, 222, 111230. https://doi.org/10.1016/j.petrol.2022.111230
Ardian, A., & Kumral, M. (2021). Enhancing mine risk assessment through more accurate reproduction of correlations and interactions between uncertain variables. Mineral Economics, 34(3), 411–425. https://doi.org/10.1007/s13563-020-00238-z
Armstrong, M., Lagos, T., Emery, X., Homem-de-Mello, T., Lagos, G., & Sauré, D. (2021). Adaptive open-pit mining planning under geological uncertainty. Resources Policy, 72, 102086. https://doi.org/10.1016/j.resourpol.2021.102086
Cardozo, F. A. C., Petter, C. O., & Albuquerque, N. R. de. (2022). Monte Carlo simulation risk analysis for underground mining projects. Tecnologia Em Metalurgia, Materiais e Mineração, 19, e2681. https://doi.org/10.4322/2176-1523.20222681
Chandra, A., & Hartley, P. R. (2024). Sequential investment decisions for mining projects using compound multiple volatility real options approach. Resources Policy, 97, 105241. https://doi.org/10.1016/j.resourpol.2024.105241
Fathollahzadeh, K., Asad, M. W. A., Mardaneh, E., & Cigla, M. (2021). Review of solution methodologies for open pit mine production scheduling problem. International Journal of Mining, Reclamation and Environment, 35(8), 564–599. https://doi.org/10.1080/17480930.2021.1888395
Faúndez, P., & Guzmán, J. I. (2025). Deconstructing cost overrun and delay in mining projects: A system-based model of prices, quantities, and time. Resources Policy, 110, 105754. https://doi.org/10.1016/j.resourpol.2025.105754
Hozman, J., Tichý, T., & Dvořáčková, H. (2024). Valuation of mining projects under dynamic model framework. Annals of Operations Research, 337(3), 1167–1204. https://doi.org/10.1007/s10479-023-05569-y
Kamel, A., Elwageeh, M., Bonduà, S., & Elkarmoty, M. (2023). Evaluation of mining projects subjected to economic uncertainties using the Monte Carlo simulation and the binomial tree method: Case study in a phosphate mine in Egypt. Resources Policy, 80, 103266. https://doi.org/10.1016/j.resourpol.2022.103266
Khodaeibabajan, A., & Ozturk, C. A. (2026). A risk-based decision framework for economic sustainability in open-pit gold mining using Monte Carlo simulation. Sustainability, 18(9), 4448. https://doi.org/10.3390/su18094448
Lagos, T., Armstrong, M., Homem-de-Mello, T., Lagos, G., & Sauré, D. (2022). A framework for adaptive open-pit mining planning under geological uncertainty. Optimization and Engineering, 23(1), 111–146. https://doi.org/10.1007/s11081-020-09557-0
Markovic, P., Stevanovic, D., Kolonja, B., Slavkovic, D., & Krzanovic, D. (2025). A hybrid model for risk-based strategic planning in open-pit mining: Integrating deterministic, stochastic, and ISO 31000 approaches. Applied Sciences, 15(5), 2500. https://doi.org/10.3390/app15052500
Page, M. J., McKenzie, J. E., Bossuyt, P. M., Boutron, I., Hoffmann, T. C., Mulrow, C. D., … Moher, D. (2021). The PRISMA 2020 statement: An updated guideline for reporting systematic reviews. BMJ, 372, n71. https://doi.org/10.1136/bmj.n71
Singh, J., Ardian, A., & Kumral, M. (2021). Gold-copper mining investment evaluation through multivariate copula-innovated simulations. Mining, Metallurgy & Exploration, 38(3), 1421–1433. https://doi.org/10.1007/s42461-021-00424-9
Stanujkic, D., Fedajev, A., & Santos, M. (2023). Investment projects evaluation in a fuzzy environment using the simplified WISP method. Serbian Journal of Management, 18(2), 225–235. https://doi.org/10.5937/sjm18-44522
Trijayanto, T., & Hakam, D. F. (2025). Economic viability and flexibility of the South Pasopati Coal Project, Indonesia: A real options approach under market volatility and carbon pricing. Journal of Risk and Financial Management, 18(5), 225. https://doi.org/10.3390/jrfm18050225
Valer Dávila, J. C., Gómez Galarza, V., & Court Monteverde, E. (2024). High-dimensional private and social optimal policy valuation model for non-renewable natural resource extraction projects for multivariate public policy decisions. Resources Policy, 96, 105230. https://doi.org/10.1016/j.resourpol.2024.105230
Yang, W., Fang, N., Wang, Y., Long, T., Deng, S., Xue, M., & Deng, B. (2022). Value evaluation of mining right based on fuzzy real options. Resources Policy, 78, 102818. https://doi.org/10.1016/j.resourpol.2022.102818
Bila bermanfaat silahkan share artikel ini
Berikan Komentar Anda terhadap artikel Penilaian Risiko dan Alokasi Modal pada Investasi Proyek Tambang di Bawah Ketidakpastian: Peran Simulasi Monte Carlo
Pages: 816-827
Copyright (c) 2026 Fredy Mukti, Riam Marlina

This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under Creative Commons Attribution 4.0 International License that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgment of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (Refer to The Effect of Open Access).