Analisa Kelayakan Investasi Proyek Moda Transportasi Masal Light Rail Transit (LRT) Jabodebek
Abstract
This journal aims to analyze the feasibility of investing in mass transportation development project in Indonesia, specifically LRT Jabodebek project using Capital Budgeting method. The author conducted an investment feasibility analysis using four Capital Budgeting methods, which consist of Payback Period (PP), Net Present Value (NPV), Profitability Index (PI), and Internal Rate of Return (IRR). In addition, there is also a sensitivity analysis to measure the impact of important variable changes on the analysis results. The analysis results show that the LRT Jabodebek project is a feasible project to continue, which indicated by PP duration of 22.59 years, NPV above 11 trillions rupiahs, PI of 1.42, and IRR of 8.09%. Sensitivity analysis shows that LRT Jabodebek project is still in the feasible category after being recalculated by applying several scenarios. This journal is expected to have significant implications for decision-makers and stakeholders in the public transportation investment sector in Indonesia.
Downloads
References
Adnan, M., & Herijanto, W. (2019). Perencanaan Ulang LRT Jabodebek Lintas Pelayanan 3 (Cawang-Bekasi Timur) dengan Modifikasi Alinyemen Ditinjau dari Segi Kelayakan Ekonomi dan Finansial. Jurnal Teknik ITS, 7(2), 3–8. https://doi.org/10.12962/j23373539.v7i2.32638
Apriyanto, A. (2022). ANALISIS WILLINGNESS TO PAY DAN ABILITY TO PAY CALON PENGGUNA LRTJABODEBEK PADA LINTAS BEKASI -CAWANG. Jurnal Penelitian Sekolah Tinggi Transportasi Darat, 13(2), 2022.
Arifin, S. R., & Wisudanto. (2017). Crowdfunding Sebagai Alternatif Pembiayaan Pembangunan Infrastruktur. Prosiding Simposium II – UNIID, September, 309–314.
Badan Pusat Statistik. (2023a). Berita Resmi Statistik Pertumbuhan Ekonomi Indonesia Triwulan IV-2022. In Www.Bps.Go.Id (Issue 15/02/Th. XXVI). https://www.bps.go.id/pressrelease/2020/02/05/1755/ekonomi-indonesia-2019-tumbuh-5-02-persen.html
Badan Pusat Statistik. (2023b). Jumlah Kendaraan Bermotor Menurut Jenis Kendaraan (Unit). In Badan Pusat Statistik. https://kaltara.bps.go.id/indicator/17/387/1/jumlah-kendaraan-bermotor-menurut-jenis-kendaraan.html
Bintari, A., & Pandiangan, L. H. S. (2016). Formulasi Kebijakan Pemerintah Tentang Pembentukan Badan Usaha Milik Daerah (BUMD) Perseroan Terbatas (PT) Mass Rapid Transit (MRT) Jakarta Di Provinsi Dki Jakarta. Jurnal Ilmu Pemerintahan, 2(2), 220–238. https://doi.org/10.24198/cosmogov.v2i2.10006
Budiningsih, I., Soehari, T. D., & Marlison, M. (2020). Hard Skill versus Soft Skill dalam Pencapaian Kinerja Karyawan Proyek Infrastruktur Mass Rapid Transit (MRT) Jakarta. Akademika, 9(02), 29–42. https://doi.org/10.34005/akademika.
Fadliansyah. (2020). Overview Penyelenggaraan Kereta Api Ringan (LRT) Terintegrasi di Wilayah Jakarta, Bogor, Depok, dan Bekasi.
Frost, G., & Rooney, J. (2021). Considerations of sustainability in capital budgeting decision-making. Journal of Cleaner Production, 312(December 2020), 127650. https://doi.org/10.1016/j.jclepro.2021.127650
Hensher, D. A., Ho, C., & Mulley, C. (2015). Identifying preferences for public transport investments under a constrained budget. Transportation Research Part A: Policy and Practice, 72, 27–46. https://doi.org/10.1016/j.tra.2014.12.002
Karya, P. A. (2018). Executive Summary Feasibility Study LRT. In LRT Jabodebek (Vol. 59, Issue 2). https://doi.org/10.4018/978-1-59140-055-4.ch008
Perpres Nomor 3 Tahun 2016, 147 Badan Pemeriksa Keuangan 11 (2016). https://peraturan.bpk.go.id/Home/Details/38201/perpres-no-3-tahun-2016
KPPIP. (2021). Laporan KPPIP Semester 2 Tahun 2021.
Magni, C. A., & Marchioni, A. (2020). Average rates of return, working capital, and NPV-consistency in project appraisal: A sensitivity analysis approach. International Journal of Production Economics, 229(April). https://doi.org/10.1016/j.ijpe.2020.107769
Perkeretaapian, D. J. (2017). Pemerintah Akan Memberikan Subsidi Tarif LRT Jabodebek Kementerian Perhubungan Republik Indonesia. https://dephub.go.id/post/read/pemerintah-akan-memberikan-subsidi-tarif-lrt-jabodebek
Prasetyo, R. B., & Firdaus, M. (2009). Pengaruh Infrastruktur Pada Pertumbuhan Ekonomi Wilayah di Indonesia. Jurnal Ekonomi Dan Kebijakan Pembangunan, 2(2), 222–236. http://repository.ipb.ac.id/handle/123456789/53638
PUPR, K. (2012). Panjang Jalan Jakarta Baru Penuhi 60 Persen Kebutuhan. PUPR Web; https://pu.go.id/. https://pu.go.id/page/Struktur-Organisasi%0Ahttps://pu.go.id/berita/kementerian-pupr-lanjutkan-pembangunan-jalan-perbatasan-indonesia-malaysia-di-kalimantan-utara
Purba, A., & Purba, J. T. (2020). Jakarta-Bandung High-Speed rail transportation project: Facts and challenges. IOP Conference Series: Materials Science and Engineering, 918(1). https://doi.org/10.1088/1757-899X/918/1/012034
Putri, E. S., & Wisudanto, W. (2017). Struktur Pembiayaan Pembangunan Infrastruktur di Indonesia Penunjang Pertumbuhan Ekonomi. IPTEK Journal of Proceedings Series, 3(5), 222–228. https://doi.org/10.12962/j23546026.y2017i5.3136
Ridwan, A. F., Romli, Z., & Soeroto, W. M. (2022). Analisa Kelayakan Investasi Proyek Penggantian Secondary Crusher Pada PT Berau Coal Site Binungan. Sebatik, 26(1), 1–8. https://doi.org/10.46984/sebatik.v26i1.1832
Siziba, S., & Hall, J. H. (2021). The evolution of the application of capital budgeting techniques in enterprises. Global Finance Journal, 47(July 2019), 100504. https://doi.org/10.1016/j.gfj.2019.100504
Tempo. (2022). Bos KAI Curhat Soal Biaya Proyek LRT Jabodebek Membengkak jadi Rp 32,5 Triliun. https://bisnis.tempo.co/read/1609484/bos-kai-curhat-soal-biaya-proyek-lrt-jabodebek-membengkak-jadi-rp-325-triliun
Tjahjono, T., Kusuma, A., & Septiawan, A. (2020). The Greater Jakarta Area Commuters Travelling Pattern. Transportation Research Procedia, 47(2019), 585–592. https://doi.org/10.1016/j.trpro.2020.03.135
Bila bermanfaat silahkan share artikel ini
Berikan Komentar Anda terhadap artikel Analisa Kelayakan Investasi Proyek Moda Transportasi Masal Light Rail Transit (LRT) Jabodebek
Pages: 1180-1190
Copyright (c) 2023 Rocky Francis Hunila, Suryo Utomo, Niluh Gede Annila Pradyani

This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under Creative Commons Attribution 4.0 International License that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgment of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (Refer to The Effect of Open Access).




















